Summer Tour of the Ancient 
World

Introduction

Task

Process

Evaluation

Conclusion

Teacher Notes

flower graphic is from
http://www.atpm.com/6.10/british-colum
bia/images/butchart-gardens-6.jpg
 

Evaluation

You need to turn in your intinerary for Mr. Davis on the due date and a list of the websites you used.  The itinerary should include:
*     Dates
*     Times (Convert to Eastern Standard Time)
*     Locations
*     Modes of transportation
*     Sleeping Arrangements
      (needs at least 8 hours of sleep each day)
*     Costs (Including total trip cost)

**Optional:  You can include pictures on your itinerary to make it more visually appealing.**
 
 
Criteria: Insufficient(1-2) Satisfactory(3-4) Excellent(5) Points Earned
Visit the Seven Wonders of the Ancient World Visited 3 or less of the correct Wonders Visited 4-6 of the correct Wonders Visited all 7 of the correct Wonders  
Conversion of Time Times are not in Eastern Standard format About half of times were converted to Eastern Standard format All times were correctly converted to Eastern Standard format  
Dates Did not complete trip in time allotted The trip took the complete 3 months The trip took less than 3 months  
Found sleeping arrangements  for at least 8 hours No sleeping information or did not sleep 8 hours a day for 4 or more locations No sleeping information or did not sleep for 8 hours a day for 1-3 locations Sleeping information and allowed time to sleep for 8 hours for every location  
Cost Information Did not include costs or calculations are incorrect for 5 or more items Did not include costs or calculations are incorrect for 1-4 items Included costs for all items and correct calculations are given  
      Total Points Earned out of  25